Elkhorn Slough tower installation Posted on November 22, 2021 by mamwood Susan and Gracie working on installing the new eddy covariance tower in the Elkhorn Slough! Share via: Click to share on X (Opens in new window) X Click to share on Facebook (Opens in new window) Facebook Click to share on LinkedIn (Opens in new window) LinkedIn Share this post: Share on X (Twitter) Share on Facebook Share on Pinterest Share on LinkedIn Share on Email